I raised this old MH 14 inches last week, the tires were buried in the dirt when we started, now they are 2 inches above grd. I want to take it up another 8-10 inches. the place is level within a 1/4 inch now, when we started the doors were all racked, now they all close. the woner placed it here in 1973, there were about 4 piers on one side and 3 on the other, the place was never tied down.
What would be the best way to go higher. do one side, then the other
. or do one end and then do the other and then the wheel section
raising a MH
Moderators: Greg, Mark, mhrAJ333, JD
-
- Posts: 383
- Joined: Mon Oct 25, 2010 9:53 pm
- Location: Steuben County, NY
I'd like to see a pier every 5-6 feet.
-