My wife, 8 month daughter and I just purchased our first home as a small family.
A 1996 skyline double and now to make it ours. After much deliberation we decided to start with the small, second bathroom. I didnt feel like testing my taping and mudding skills on the first room we tackled, so we went with bead board. A lot of sins are hidden under that board
![Wink :wink:](./images/smilies/icon_wink.gif)
wish i had taken a before photo. It wasn't terrible, just dated and dark. We tiled the floor, added a new vanity and sink top and light fixure. The tub/shower and toilet cleaned up really nice, and the bead board fit over the exposed screws all along the tub shower to create a real nice finished look. Just need to finish the crown molding and some paint touch-ups and this first remodel job is in the books. What do you all think?
IMG_20121031_203228.jpg
20121012_091052.jpg
20121012_091908.jpg
You do not have the required permissions to view the files attached to this post.